Page 3 of 5
Original text
Cost
Q
Q1
ATC curve is U-shaped because of
the shape of TC, how do their shapes
related?
A
The line 0B is flatter than
OA!
It means ATC of producing
Q2 is lower than the ATC of
producing Q1.
TC1
To produce Q1,
the total cost is
TC1 (Point A). How
can we find the
ATC graphically?
TC
Q
The slope of this line 0A, i.e.
TC/Q = ATC
0
B
Q2
Q3
C
Q4
D
Suppose we increases output
from Q1 to Q2 (Point B on TC
curve), how does ATC change?
TC
What if we keep increasing
output from Q1 to Q3 (Point C
on TC curve), how does ATC
change?
ATC decreases as Q
increases (until point
C)!
How about we further
produce more from Q3 to Q4
(Point D on TC curve), how
does ATC change?
ATC increases as Q
increases (after point
C)!
So, ATC is U-shaped given the typical
shape of TC!